Brewpubs are the most demanding format we support. Equipment lead times, specialist hiring and licensing all run longer than owners expect, and they run in parallel.
Equipment lead times set the opening date
Brewing vessels, glycol chilling and dispense systems are ordered months ahead. Fix the brewing capacity and floor plan first; almost every other decision is downstream of that.
Hire the brewer before the fit-out finishes
A brewer joining during installation will catch layout and utility problems that cost a fortune to fix later — and will have the first batches ready for opening week.
- Plan utilities: water treatment, drainage, power load, glycol lines.
- Budget for trial batches and dump batches before launch.
- Train service staff on the beer list, not just the food menu.
Compliance is a continuing task
Licensing, record-keeping and inspections continue long after opening. Assign a named owner for compliance internally, or the responsibility drifts.
Key takeaway
Order long-lead equipment early, hire your brewer before the fit-out ends, and treat compliance as an ongoing role.